D-Bot Build: Mechanical Pre-Assembly HD

30.11.2017
The mechanical pre-assembly steps of the D-Bot build guide are covered in this video. I go over some tips for placing the bearings in the rear idlers and H-bar ends. After the frame is put together the belts will route through these bearing assemblies providing the CoreXY motion system. There are 2x bearing assembles to be placed in each rear idler and H-bar end, for a total of 4x assemblies -- one per part is shown in this video. Also shown at the end of this video is assembling the OpenBuilds mini-V wheels. Click here to skip to V-Wheel assembly: https://youtu.be/lOxu5rd4d8g#t=3m33s D-Bot on Thingiverse: https://www.thingiverse.com/thing:1001065 Credits: Species is licensed under a Creative Commons Attribution license (https://creativecommons.org/licenses/by/4.0/)

Похожие видео

Показать еще